Blue Chip Bank in London – 2 x 800kVA Generator Installation

This week we completed the installation of 2 x 800kVA generators for a UK bank HQ in London, Offload was required to be offloaded down a void of 30m into the basement and skated into plant room. Cleaned & De-gased an existing 100,000Litre bulk tank. Installed a new fuel system including pipe in pipe mild steel pipework and 2 new day tanks, fuel polisher, all associated control cables, installation of pump panel and bund alarms and steel bund around the two new generators. Installation and Insulation of 4 exhaust silencers and interconnecting flues and downpipes.