Generator plant room installation for a new office block development in central London

GI have been commissioned to install a new generator plant room fit out for a new development in central London, the install consists of offload and position, coolant pipework from the generator located in the basement to the radiator located on the roof of the building, fuel system, including pipe in pipe mild steel pipework and commission the installation. Last week we completed the offload and position.Generator silencer