New development in central London – 850kVA Generator Installation

This week we completed the installation 850kva generator for a new development in London, works included offload, position and installation of generator, bulk tank, day tank, attenuation and silencer, which included 300m of pipe in pipe mild steel pipework, remote Radiator coolant pipework, silencer frame and exhaust pipework and insulation.

0
  Related Posts
  • No related posts found.