Plant movement and installation in Warwick

Generator Installations were asked to carry out a machine movement in Warwick. The job included moving an existing 60kVA generator 600 meters from its current location into a new purpose built compound, taking delivery of a new bulk fuel tank and supplying and installing a fuel transfer system between the bulk tank and the generator base tank.

IMG_0714

Our experienced plant movement engineers moved the generator quickly and safely, while protecting a newly laid footpath from the weight of the generator.

IMG_0777

Once the generator was positioned and the fuel system was installed the set was fully commissioned and run for 30 minutes.

IMG_0779

During the works we supplied a temporary generator to ensure the clients DRP was not compromised.