As previously mention we have been commissioned to install a 1200Kva Generator Set and Fuel System in a new development in London.
Last week we completed the offload & position of the set. We used a tower crane to lift the set from a flatbed lorry and lowered the generator to the basement level with only a few centimetres of free space either side. The set was placed onto an offload stand and was lowered and skated to its final position.
Please see some pictures below…