Three 2500kVA generators installed at a data centre in slough

Generator Installations was asked to assist with the installation of three 2500kVA generators at a large new build data centre in Slough. This job presented a unique set of challenges that our team of experienced engineers and lift supervisors handled quickly, cost effectively and safely.

The first challenge, how to get three 15 ton diesel tanks into an already part constructed building on offload conditions, where the space was limited to 10mm allowance?

IMG_3958 Continue Reading →