From fuel storage through to the generator — another complete installation delivered in West London. ⚡
Our team recently completed the fuel system and associated electrical works for a client in West London, bringing together the

Replacing faulty fuel equipment in the heart of Central London. 🔧
A recent project completed by the Generator Installations team involved the replacement of a fuel polisher and duplex pump set,

40 feet up. 16 slab tanks. One coordinated fuel transfer system. 🏗️
A look at the scale of the latest works being carried out by the Generator Installations team on this project

Positive feedback like this never gets old. ⭐
At Generator Installations, we take great pride in delivering every project to the highest standard, so receiving feedback like this

📍 Generator Installations is expanding
We’re proud to announce that we are now operating from our new dedicated 6,000 sq ft premises, marking another exciting

⚡ A complete generator fit-out is far more than connecting a few cables.
These photos show the level of electrical work involved in the full fit-out of two generator sets for a London

Qualifications are important — but it’s where you put them into practice that really counts. ⚡
Our electrical apprentice, Jonny Morley, recently completed his NVQ Level 2 and is pictured here working on a hospital project

Fuel supply from below ground to rooftop generators across Central London. ⛽🏙️
This project involved the installation of a fuel transfer system connected to a 30,000-litre underground storage tank, supplying rooftop generators

Protecting the equipment while delivering a clean, secure installation. 🔧⚡
Transfer and dump lines installed across a generator gantry as part of a data centre project in Slough. With the

Engineering, fabrication and installation working together 🤝⚡
A closer look at Phase 1 & Phase 2 of our Harefield Hospital project in London, showcasing the coordination between

Precision pipework, even in the tightest spaces ⚙️
A closer look at a recent Generator Installations project in Canary Wharf 📍 Our team have completed the installation of

Progress continues on our ongoing data centre project in Slough
Generator Installations is currently delivering a range of mechanical infrastructure works as part of this large-scale critical power installation, helping

Another fuel system installation project underway for Generator Installations.
GI have been contracted for a project at a small airport in Biggin Hill, Kent to supply and install a

A few more photos from a recently completed hospital project in London 📸🏥
This project involved the installation and integration of a fabricated fuel tank and associated fuel transfer system supporting the site’s

Project Update | Slough Data Centre ⚙️
Generator Installations has recently completed the installation of DN65 FSR pipework across a major data centre project in Slough. This

Recently Completed 🏥
We’re pleased to share the successful completion of a fuel system installation at a London-based hospital — supporting a critical

Another key delivery landing on site for our Slough data centre project
This time, it’s our fuel pipe modules arriving on site. Fabricated and installed by Generator Installations, with bulk fuel tanks

Another major delivery incoming for a Slough data centre project
This one’s all about fuel and fluid storage done right. Working alongside our sister company Metcraft, this package includes a

Project complete in Slough
We’re pleased to confirm the successful completion of our fuel system installation at a data centre in Slough — now
Project Secured | Lisbon, Portugal
We’re pleased to announce that Generator Installations has secured a new international project in Lisbon, delivering the mechanical fit-out of